by designer@lukehayes.com.au | May 12, 2026 | Case Studies
Client or Situation Overview A residential strata scheme in metropolitan Sydney, comprising 99 lots, required funding to undertake extensive balcony defect and remediation works. The building, completed in 2015, was experiencing water ingress and associated façade...
by designer@lukehayes.com.au | May 5, 2026 | Case Studies
Client or Situation Overview A residential strata scheme in Wollongong, NSW, comprising 42 lots, required funding to undertake a comprehensive structural and waterproofing upgrade. Originally constructed in the 1960s, the building had transitioned from short-stay...
by designer@lukehayes.com.au | May 5, 2026 | Case Studies
Client or Situation Overview A large mixed-use strata scheme in Hornsby, NSW, comprising 154 lots, required funding to address essential fire safety compliance works while also managing an existing loan facility. Challenge / Problem Urgent fire damper remediation...
by designer@lukehayes.com.au | May 5, 2026 | Case Studies
Client or Situation Overview A large residential strata scheme in Western Sydney, comprising 208 lots, required funding to undertake extensive remediation works addressing waterproofing, water ingress, balustrade replacement, and fire safety defects. Challenge /...
by designer@lukehayes.com.au | Apr 29, 2026 | Uncategorised
Why postponing necessary works often increases costs, risk, and owner conflict. INTRODUCTION In many strata schemes, the most common response to major repairs is delay. Committees hesitate. Owners ask for more quotes. Motions are deferred to the next meeting....